Is the hydroelectric power remodeling partial or complete?
1. Local reconstruction of electric displacement:
It is to modify and improve the navigation route on the basis of the existing line, and at the same time maintain the immobility of the main line. And do some waterway remodeling according to one's own needs.
The advantage is that it saves money and time. However, because it is reconstructed on site, the materials we purchased are different from the materials used by the developer, which may have an impact later.
2. Overall reconstruction of electric displacement:
It is to thoroughly discard the waterway route reconstructed by the original contractor and remodel it according to one's own needs and new specifications.
The cost budget will increase significantly and it will take more time than reconstruction on site.
Whether water and electricity flow to the ground or above:
① It is recommended to use the ceiling, except for places where water is needed in the ceiling, kitchen, and toilet. ② It is recommended to walk on the floor in places where water is not needed, such as the living room, bedroom, and porch.
The main switch, lighting, public outlet, kitchen outlet, toilet outlet, living room air conditioner, main sleeping air conditioner, sub sleeping air conditioner each need one line, the refrigerator can be used for short-term business trips!
5, TV background wall:
Behind the background wall of the network cable socket, 50 PVC cable tubes are embedded, and the network cable and power cable are routed through the pipeline, so that the end of the messy wire is not visible! The location of the outlet on the TV background wall must also be planned in advance.
6, Strong and weak electric box provided by the developer:
The position is conspicuous and the style is not beautiful, so it can be switched during the hydroelectric power modification period. Here is the secret: buy a decorative painting of a strong electric box on the Internet and cover it perfectly!
7, Lighting:
The main lamps in the living room and bedroom should be double-control lamps. The entrance cabinet and kitchen hanger should leave the lighting line, and the lighting line can be added in the later stages.
8, Both sides of the bed headboard:
Two outlets are provided on both sides of the bed, so you can charge your mobile phone or use a desk lamp to prepare for emergencies.
9, if the projection screen is installed:
The outlet must be left in the screen slot! If the projector is hung up, the projector socket must be reserved on the sofa wall.
10, after the water pipe is completed, pressurization is required:
Do not omit pressing! If it does not exceed 0.05 MPa within 30 minutes, it is passed!
1. Local reconstruction of electric displacement:
It is to modify and improve the navigation route on the basis of the existing line, and at the same time maintain the immobility of the main line. And do some waterway remodeling according to one's own needs.
The advantage is that it saves money and time. However, because it is reconstructed on site, the materials we purchased are different from the materials used by the developer, which may have an impact later.
2. Overall reconstruction of electric displacement:
It is to thoroughly discard the waterway route reconstructed by the original contractor and remodel it according to one's own needs and new specifications.
The cost budget will increase significantly and it will take more time than reconstruction on site.
Whether water and electricity flow to the ground or above:
① It is recommended to use the ceiling, except for places where water is needed in the ceiling, kitchen, and toilet. ② It is recommended to walk on the floor in places where water is not needed, such as the living room, bedroom, and porch.
The main switch, lighting, public outlet, kitchen outlet, toilet outlet, living room air conditioner, main sleeping air conditioner, sub sleeping air conditioner each need one line, the refrigerator can be used for short-term business trips!
5, TV background wall:
Behind the background wall of the network cable socket, 50 PVC cable tubes are embedded, and the network cable and power cable are routed through the pipeline, so that the end of the messy wire is not visible! The location of the outlet on the TV background wall must also be planned in advance.
6, Strong and weak electric box provided by the developer:
The position is conspicuous and the style is not beautiful, so it can be switched during the hydroelectric power modification period. Here is the secret: buy a decorative painting of a strong electric box on the Internet and cover it perfectly!
7, Lighting:
The main lamps in the living room and bedroom should be double-control lamps. The entrance cabinet and kitchen hanger should leave the lighting line, and the lighting line can be added in the later stages.
8, Both sides of the bed headboard:
Two outlets are provided on both sides of the bed, so you can charge your mobile phone or use a desk lamp to prepare for emergencies.
9, if the projection screen is installed:
The outlet must be left in the screen slot! If the projector is hung up, the projector socket must be reserved on the sofa wall.
10, after the water pipe is completed, pressurization is required:
Do not omit pressing! If it does not exceed 0.05 MPa within 30 minutes, it is passed!
모바일바카라카지노사이트추천 카지노사이트바카라사이트 검증카지노사이트카지노사이트 온라인생방송라이브바카라 온라인바카라앱 다이야카지노검증 비바카지노 모바일바카라슬롯사이트 타이틀카지노먹튀 에볼루션바카라온라인바카라 카지노베팅법 바카라잘하는 카지노먹튀 마닐라카지노 바카라사이트쿠폰 다이야카지노검증 더신화카지노 짝귀바카라사이트 마닐라바카라후기 카지노추천사이트 티파니카지노추천 카지노슬롯머신종류 타이틀카지노 바카라공식 아벤카지노무료쿠폰 마카오온라인카지노 카지노사이트오토프로그램 카지노슬롯 카지노라이브24 검증온라인바카라사이트추천인터넷바카라사이트 바카라주소실시간 해와카지노사이트슬롯게임 프리카지노주소 모바일카지노해외바카라사이트 산타바카라 바카라사이트모바일카지노 카지노검색 실시간카지노 바카라이미지 sm카지노무료쿠폰 하이브카지노문자 카지노1번지 에볼루션카지노추천온라인바카라사이트 검증카지노사이트모바일슬롯게임 모바일바카라카지노사이트추천 샌즈카지노먹튀 추천온라인바카라사이트카지노게임 바카라군단 카지노돈 스페이스맨카지노싸이트 바카라잘하는 추천인터넷카지노사이트모바일슬롯사이트 아리아카지노총판 인터넷카지노사이트추천카지노사이트추천 티파니바카라사이트 뉴온라인바카라 카지노룰렛 추천온라인바카라사이트검증온라인바카라사이트 산타카지노추천 바카라싸이트 sm바카라사이트 온라인바카라사이트추천모바일슬롯게임 우리카지노쿠폰 아테나카지노무료쿠폰 에볼루션카지노 우리카지노조작 해와카지노사이트모바일슬롯사이트 검증인터넷카지노사이트 플러스카지노총판 카지노먹튀신고
- 이전글15 Best Twitter Accounts To Discover More About Manchester Double Glazing 24.11.02
- 다음글The 10 Most Terrifying Things About Double Glazing Window Repairs 24.11.02
댓글목록
등록된 댓글이 없습니다.