본문 바로가기

Do you want to change the displacement of the electrical control locally or completely? > 자유게시판

본문 바로가기

회원메뉴

쇼핑몰 검색

회원로그인

회원가입

오늘 본 상품 0

없음

자유게시판

Do you want to change the displacement of the electrical control local…

페이지 정보

profile_image
작성자 ulsB1s
댓글 0건 조회 3회 작성일 24-11-02 13:20

본문

Is the hydroelectric power remodeling partial or complete?

1. Local reconstruction of electric displacement:

It is to modify and improve the navigation route on the basis of the existing line, and at the same time maintain the immobility of the main line. And do some waterway remodeling according to one's own needs.

The advantage is that it saves money and time. However, because it is reconstructed on site, the materials we purchased are different from the materials used by the developer, which may have an impact later.

2. Overall reconstruction of electric displacement:

It is to thoroughly discard the waterway route reconstructed by the original contractor and remodel it according to one's own needs and new specifications.

The cost budget will increase significantly and it will take more time than reconstruction on site.

Whether water and electricity flow to the ground or above:

① It is recommended to use the ceiling, except for places where water is needed in the ceiling, kitchen, and toilet. ② It is recommended to walk on the floor in places where water is not needed, such as the living room, bedroom, and porch.

The main switch, lighting, public outlet, kitchen outlet, toilet outlet, living room air conditioner, main sleeping air conditioner, sub sleeping air conditioner each need one line, the refrigerator can be used for short-term business trips!

5, TV background wall:

Behind the background wall of the network cable socket, 50 PVC cable tubes are embedded, and the network cable and power cable are routed through the pipeline, so that the end of the messy wire is not visible! The location of the outlet on the TV background wall must also be planned in advance.

6, Strong and weak electric box provided by the developer:

The position is conspicuous and the style is not beautiful, so it can be switched during the hydroelectric power modification period. Here is the secret: buy a decorative painting of a strong electric box on the Internet and cover it perfectly!

7, Lighting:

The main lamps in the living room and bedroom should be double-control lamps. The entrance cabinet and kitchen hanger should leave the lighting line, and the lighting line can be added in the later stages.

8, Both sides of the bed headboard:

Two outlets are provided on both sides of the bed, so you can charge your mobile phone or use a desk lamp to prepare for emergencies.

9, if the projection screen is installed:

The outlet must be left in the screen slot! If the projector is hung up, the projector socket must be reserved on the sofa wall.

10, after the water pipe is completed, pressurization is required:

Do not omit pressing! If it does not exceed 0.05 MPa within 30 minutes, it is passed!



댓글목록

등록된 댓글이 없습니다.